Lead times

Please see below the current lead times for each of our cycles to be hand-built and shipped from our factory in Stratford-upon-Avon.
 
As a result of recent demand increases and challenges in sourcing parts from suppliers, some of these lead times have been considerably extended. If you would like to order a cycle as a gift in the meantime, we can post you a Pashley greetings card - left blank inside for your own message - along with an image of the cycle you have ordered, so you have something to present on the day.
 
Last updated on: 15th October 2021
 

Bicycles:

Model Name  Current Lead Time
Penny 6 - 8 weeks
Parabike 6 - 8 weeks
Tube Rider 6 - 8 weeks
Guv'nor 6 - 8 weeks
Speed 5  6 - 8 weeks
Aurora 10 - 12 weeks
Countryman 10 - 12 weeks
Roadster  6 - 8 weeks (18 - 20 weeks for 8 speed)
Briton 6 - 8 weeks
Pashley-Morgans 10 - 12 weeks (18 - 20 weeks for 8 speed)
Poppy 6 - 8 weeks
Britannia 6 - 8 weeks (18 - 20 weeks for 8 speed)
Princess 6 - 8 weeks (18 - 20 weeks for 8 speed)

Tricycles:

Model Name  Current Lead Time
Robin 8 - 10 weeks
Tri-1 16 - 18 weeks
Picador 15" 16 - 18 weeks
Picador 17" 16 - 18 weeks

Carrier Cycles:

Model Name  Current Lead Time
Parabike Fleet 8 - 10 weeks
Courier Please contact us
Deli Bike 8 - 10 weeks
Classic No.33 8 - 10 weeks
Euroload Trailer 8 - 10 weeks
Pronto 8 - 10 weeks
Loadstar 8 - 10 weeks
P2 8 - 10 weeks
e-P2 20 - 22 weeks
e-Pronto 20 - 22 weeks